PROJECT OVERVIEW:
PAFB North Housing Shoreline Revetment – Shoreline Stabilization
Patrick Air Force Base, Florida
45th Space Wing (45 CES/CEL)
CORE was contracted to construct a shoreline revetment at Patrick Air Force Base, Florida. The purpose of this project was to stabilize approximately 2,600 feet of the shoreline along the PAFB North Housing area to avoid further erosion during storm events.
PROJECT OVERVIEW:
Concrete Reduction and Recycling
John F. Kennedy Space Center, Florida
National Aeronautics and Space Administration (NASA)
CORE was contracted to complete concrete reduction and recycling/crushing at the NASA landfill on KSC. The overall goal of the project was to eliminate a stockpile of concrete placed many years ago and turn it into a viable resource supporting future NASA construction projects.
PROJECT OVERVIEW:
Design & Construction of Viera Veterans Affairs Outpatient Clinic – 30,000 square foot addition to the Viera VA Medical Clinic
PROJECT OVERVIEW:
Taxiway Mike 2 – Drainage Improvements
Air National Guard – Jacksonville International Airport, Florida
CORE was contracted to install reinforced concrete drain pipe at the Air National Guard facility located at the Jacksonville International Airport. The intent of the project was to tie into and extend the current drain pipe to allow greater shoulder area along the taxiway to support aircraft.
Special considerations related to this project included coordination of flight line work with security personnel and demobilization/remobilization for an approaching hurricane.
PROJECT OVERVIEW:
Regional Stormwater Improvements Design,
Cape Canaveral AFS, Florida
- Combined stormwater and groundwater treatment system
- Manage (capture, route and treat) stormwater runoff
- Prevent (capture and treat) groundwater contaminated with chlorinated solvents
- 1st Multi-purpose treatment system ever approved by FDEP/USEPA
- “Green” Design – Passive Treatment Systems Utilized
Stormwater Basin & VOC Groundwater Plume CaptureProject Design
PROJECT OVERVIEW:
NPDES Permit Discharge Compliance Evaluations
Cape Canaveral AFS and Patrick Air Force Base, Florida45th Space Wing (45 CES/CEVC)
- Stormwater Pollution Prevention Plan (SWPPP)
- Evaluate NPDES violations
- Locate and control the source
- Recommend/update Best Management Practices “’cut-off” impacts to river
- Implementation of BMP’s helped ensure compliance with regulatory requirements
PROJECT OVERVIEW:
Water Pump Station #7 – Construction Management Space Launch Complex 41 Deluge Pipeline Project
Cape Canaveral Air Force Station, Florida
- Excavation and placement of approximately 3,750 feet of 30-inch of cast iron, concrete lined ductile pipe
- Construct tie-ins at both the pump station and launch complex
- Install various tees throughout the run
- Navigate around numerous existing utilities, crossroads, structures and fences
- Monitor leak and pressure tests to assureproper installation
PROJECT OVERVIEW:
Site OT-30 DNAPL Remediation RCRA Corrective Measures Implementation
Patrick Air Force Base, Florida
- $4.5M (CMI) treatment of groundwater contaminated with trichloroethylene (TCE)
- In-situ application of emulsified zero valent iron (EZVI) and vegetable oil.
- Application using pneumatic fracturing
- 69,100 gallons of EZVI
- 7,100 gallons vegetable oil
- Application of KB-1TM for bioaugmentation post injection.
PROJECT OVERVIEW:
Operations & Maintenance (O&M) and Remedial Process Optimization (RPO) of Various Treatment Systems
45th Space Wing (45 CES/CEVR)
- Performance Based Contract
- Long Term Monitoring (LTM) and O&M of multiple sites and treatment systems
- RPO of Horizontal and Vertical Air Sparge System (VASS/HASS)
- RPO of Hangar K Air Sparge Groundwater Treatment System
- RPO of 1798 and 1381 Surface Water Canal Bubbler
PROJECT OVERVIEW:
Renovate Two Little League Baseball Fields
MacDill Air Force Base, Florida
- Remove surface from each field and construct clay infields to Little League specifications including pitchers’ mounds
- Reposition and/or install new fences, foul poles, and dugouts
- Construct warning track inside the entire perimeter of the fence
- Replace and/or repair irrigation system
- Replace existing field lighting poles/system
- Sod and maintain fields prior to completion
PROJECT OVERVIEW:
Reconfigurable Armored Tactical Personnel and Collective Training System (RATPAC)
System Design/Build
- Live-fire training facility for military and law enforcement personnel
- Accurately recreates situational realism is requisite to firearms/tactical training programs
- Design, Set-up, Configuration, and Maintenance
- Walls, stairways and other interior features are reconfigured to present a different scenario for each training exercise
PROJECT OVERVIEW:
Heritage Facility Removal, Recycling, and Disposal
Cape Canaveral AFS, FL
- Demolition and Recycling of Multiple Facilities including the Solid Motor Assembly Building’s (SMAB’s) Inertial Upper Stage (IUS) Stand
- Waste Management and Recycling was completed as part of this effort
- Heating Plant Boilers (circa 1960) rigging, loading, transfer and disposal
PROJECT OVERVIEW:
Hazardous Material Surveys and Support Various Locations Worldwide – NAVFAC & USACE
- MacDill AFB, Florida – USACE
Clinic Replacement – 250K SF, 21 facilities
- Keesler AFB, Mississippi – NAVFAC
Central Heating Plant Hurricane Repairs
- NAS Oceana, Virginia – NAVFAC
EPMU Replacement
- NAS Diego Garcia – NAVFAC
Medical Facility Renovations
- Vicenza, Italy – NAVFAC
Military Family Housing/Elementary & Middle Schools
- Supported A/E design with over 2,500 lead/asbestos sampling & testing.
- Completed SPECSINTACT specifications and design drawing notes
PROJECT OVERVIEW:
Work Site September 2, 2009
Space Launch Complex 12 Blockhouse Demolition and Decommissioning
Cape Canaveral AFS, FL
- Asbestos, PCB Transformers, and PCB Paint Sampling & Abatement
- Removal and preservation of historic of Blockhouse Periscopes
- Universal waste survey and removal
- Blockhouse Demolition
- Consisted of 4 ft thick Concrete Inner Shell, 1 ft thick Concrete Outer Shell with 10 ft thick sand fill
- Steel Vault Access Door
- Over 5,000 tons of concrete and 5,000 tons of sand fill
- Recycling & Reuse
- Processed > 5,000 tons of concrete to reusable rip rap
- Recycled > 10,000 lbs of metal/recyclables
Other Representative Projects:
Marina Boat Slip Additions – MacDill AFB, Florida
Large Diameter Auger DNAPL Remediation – Cape Canaveral AFS
Melbourne Beach Optical Tracking Facility Demolition, Florida
AMTRAC Railcar Wash facility Design, Sanford, Florida
Radiation Portal Monitors – Miami Airport and Port Everglades
Stormwater Diversion Chamber Installation, Pasco County, FL
Energy Audit – Installation Wide, Cannon AFB
Generator Replacement/Upgrades, NPF Facility, Florida
Time Lapse Photography (Demolition)
Performance Based Contract (PBC) Soil RemediationSpace Launch Complex 40, Cape Canaveral AFS
|